site stats

Class iii backfill material

Web(REV 6-25-04) (FA 8-3-04) (7-05) SUBARTICLE 125-8.1.1 (Page 169) is deleted and the following substituted: 125-8.1.1 General: Backfill in the Dry whenever normal dewatering equipment and methods can accomplish the needed dewatering. A LOT is defined as one lift of backfill material placement, not to exceed 500 feet [150 m] in length or a single run WebJun 26, 1997 · Structure Backfill (Class 1) Description: Graded material defined in Subsection 703.08 (a). 100% passing the 2 inch sieve. 30-100% passing the #4 sieve. …

Technical Note

WebMany native soils are well suited for backfill provided they are compacted properly. These soils meeting the unified soil classifications of a GW, GP, SW, SP (ASTM D-2321 Class … Webundercut, backfill, and compact the trench as directed by the Engineer. Use 6A, 17A, 34R, or 46G aggregate as backfill material for undercutting due to unstable soil conditions. … plymouth holiday inn hotel https://tycorp.net

Backfill Material Selection

WebApr 17, 2024 · 4.1 This practice is for use by designers and specifiers, installation contractors, regulatory agencies, owners, and inspection organizations who are involved in the construction of sewers and other gravity-flow applications that utilize flexible thermoplastic pipe. As with any standard practice, modifications may be required for … WebMaterial that is too wet when deposited on the earthfill shall either be removed or be dried to the specified mois-ture content prior to compaction. ... Documenting Specification Conformance—In-place densities of earthfill and earth backfill requiring Class A com-paction shall be measured in accordance with ASTM D1556, D2167, D2937, or D6938 ... plymouth hope fc

SECTION 12 EXCAVATIONS 12.01 DEFINITIONS - West …

Category:2012 Standard Specifications Manual - 10 MATERIALS

Tags:Class iii backfill material

Class iii backfill material

SECTION 12 EXCAVATIONS 12.01 DEFINITIONS - West …

WebThe mechanical behavior of cemented paste backfill (CPB) in permafrost regions may depend on the thermal curing conditions. However, few experimental data are available for calibrating and validating numerical models used to predict these conditions. To fill this gap, a three-dimensional (3D) laboratory heat transfer test was conducted on CPB placed in … WebSep 12, 2024 · Note 1: This specification is a manufacturing and purchase specification only, and does not include requirements for bedding, backfill, or the relationship between field load condition and the strength classification of pipe. However, experience has shown that the successful performance of this product depends upon the proper selection of the …

Class iii backfill material

Did you know?

http://www.dot.ga.gov/partnersmart/business/source/specs/ss812.pdf Web1. Minimum covers presented here were calculated assuming Class III backfill material to 95% standard Proctor density or Class II backfill material to 90% standard Proctor density around the pipe and structural backfill to the crown of the pipe, as recommended in Section 5 of the Drainage Handbook, with an additional layer of

WebUse material made from either of the following for Type III backfill: A natural soil with a density of less than 95 lb/ft³ (1520 kg/m³) when tested with GDT 7 An artificial mixture of … WebInstitute for Transportation

WebA. Perform tests of sources for backfill material in accordance with Paragraph 2.03B. B. Verification tests of backfill materials may be performed by AW in accordance with … Web• Native soil meeting class II, III, or IVA, as described in Table 1, are NOT acceptable initial backfill materials. However, they may be used as final backfill once the initial …

WebJun 7, 2016 · Note: Minimum covers presented here were calculated assuming Class III backfill material compacted to 90% standard Proctor density around the pipe and a minimum of 6-inches (0.15m) structural backfill over the pipe crown, as recommended in Section ... Backfill materials and compaction levels not shown in the table may also be …

WebMar 4, 2016 · Types of Backfill Materials. 1. Coarse-grained soils. Coarse-grained soils include gravelly and sandy soils and range from clayey … plymouth hospital employee onlineWebThe type of pipe material received should be checked against the class or gauge pipe required by the plans. All select material used for foundation conditioning material must … plymouth horizon wikipediaWebEMBEDMENT AND BACKFILL MATERIALS The classifications of soil types are shown in Table 1, ranked in order from most supportive to least supportive. Table 1: Soil … plymouth horse race trackWeb4133.04 BACKFILL UNDER FLOWABLE MORTAR. Use one of the following: A. Natural sand complying with the requirements for Gradation No.1 of the Aggregate Gradation … plymouth horizon tc3WebClass I-V gradation requirements as riprap in Section 109. Stabilization rock shall be a crushed rock with a minimum of two fractured faces. D. Under drain Pipe Trench Backfill … plymouth hospitals nhs trust addressWebPlease refer to the appropriate specification for the requirements the material must meet for use. ... Sections 25 and 26 of the 2006 Standard Specifications were amended to allow, for Class 1, 2, 3, or 4 aggregate subbase and Class 2 or 3 aggregate base, up to 100 percent of any combination of: Processed asphalt concrete; plymouth horizon hatchbackWebCLASS III. Type 1 Select Material. Type 1 select material is a natural or manufactured fine aggregate material meeting the gradation requirements of standard size 2S or 2MS … plymouth hospitals physio self referral